DSpace Repository

Improvement study of the Overall Equipment Efficiency in a resin plant

Show simple item record

dc.contributor Vicente Buil, Manuel
dc.contributor Chamarro Aguilera, María Esther
dc.contributor Soldán Simón, Oscar
dc.creator Carretero Junquera, Carlos
dc.date 2016-09-20T16:19:47Z
dc.date 2016-09-20T16:19:47Z
dc.date 2016-02
dc.date.accessioned 2024-12-16T10:23:03Z
dc.date.available 2024-12-16T10:23:03Z
dc.identifier http://hdl.handle.net/2445/101983
dc.identifier.uri http://fima-docencia.ub.edu:8080/xmlui/handle/123456789/15327
dc.description Treballs Finals de Màster d'Enginyeria Química, Facultat de Química, Universitat de Barcelona, Curs: 2015-2016, Tutors: Manuel Vicente Buil, María Esther Chamarro Aguilera, Oscar Soldán Simón
dc.description The resin plant from AkzoNobel Coatings S.L. detected several delays between the production process and the production planning. For this reason, the Production Manager has started a project to reduce the Overall Equipment Efficiency or O.E.E., which is a percentage that correlates total production hours in a year with all the stops, programmed or not. In order to analyse the causes of the delays, the different production times have been studied in different level detail: The general production times for all the resins in a defined period. The reason of the delays for the resins that have reach more rotation in the production planning. Application of the last two points in the implementation of the transferred resin from England. The first part of the thesis studies the reactors responsible for the polyester resins, this study is stopped when the results of the different operations in the process are obtained. The reason for this change is the priority of an important resin from another reactor, the study of the polyester resins serves still as a guide in the new project. In the implementation of the transferred resin the times are studied and the corrective measures are applied to obtain a considerable time reduction in their process. A process with an average occupation time of 36 hours is reduced to 30 hours and thus, affecting the O.E.E:
dc.format 64 p.
dc.format application/pdf
dc.language eng
dc.rights cc-by-nc-nd (c) Carretero, 2016
dc.rights http://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.rights info:eu-repo/semantics/openAccess
dc.source Màster Oficial - Enginyeria Química
dc.subject Resines acríliques
dc.subject Indústria química
dc.subject Equipament industrial
dc.subject Treballs de fi de màster
dc.subject Acrylic resins
dc.subject Chemical industry
dc.subject Industrial equipment
dc.subject Master's theses
dc.title Improvement study of the Overall Equipment Efficiency in a resin plant
dc.title Estudio de mejora de la Eficiencia General de los Equipos en una planta de resinas
dc.type info:eu-repo/semantics/masterThesis


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account